Real work. Real results. A look at some of the generator, ATS, and switchgear projects we've completed for commercial, industrial, and government facilities across the region.
Commissioned a 2 MW Caterpillar standby generator system for a regional hospital, ensuring full compliance with NFPA 110 life-safety requirements. Performed full load bank testing, transfer time calibration, and detailed documentation for the facility engineering team.
Result
System passed all acceptance tests on first run. Facility achieved full NFPA 110 compliance.

Performed comprehensive maintenance and load testing on a three-generator paralleling system at a large waste water facility. Diagnosed and repaired a synchronization fault that had prevented the system from operating at full capacity.
Result
System restored to full 4.5 MW parallel capacity. Client enrolled in annual maintenance contract.

Conducted a full inspection, testing, and repair program for multiple automatic transfer switches across a military installation. Several units had not been serviced in over five years and required contact replacement and control board recalibration.
Result
All units restored to manufacturer specifications. Facility now on a bi-annual maintenance schedule.
Performed scheduled maintenance on a 15kV medium voltage switchgear lineup at a large commercial office complex. Included infrared thermography scanning, bus bar inspection, circuit breaker testing, and arc flash hazard assessment.
Result
Identified and corrected two high-resistance connections before they caused equipment damage or downtime.

Performed commissioning for a colocation data center to verify generator performance under full rated load. Testing revealed a cooling system issue that was corrected on-site, preventing a potential failure during a real outage.
Result
Cooling issue identified and repaired on-site. Generator certified for full rated capacity.
Completed a complex startup and commissioning of a new state-of-the-art 911 call center and emergency disaster headquarters. With no technical support from the switchgear manufacturer, our team worked through every challenge independently — and delivered the project ahead of schedule.
Result
Generator restored to service in under 4 hours. Facility avoided extended downtime during utility outage.
Every facility has unique power requirements. Contact us to discuss your project and get a fast, no-obligation quote from our team.